For this ambitious project, Seureca relied on a permanent team of 10 resident engineers fully dedicated to the project for 12 months:
- Step 1 – Network mapping and modelling
Based on existing data and site visits, Seureca undertook the detailed audit and mapping of the existing water networks for the related 137 cities including the economic and political capital cities of Cameroon, Douala and Yaoundé.
In Douala and Yaoundé, Seureca engineers undertook onsite measurement campaigns leading to water network modelling.
- Step 2 – Water demand calculation
Seureca established the water demand for the actual consumption and forecasts for the ultimate year of the project, year 2032.
- Step 3 – Water resource evaluation
Seureca assessed the availability of water resources against the needs calculated in the the previous step. In addition, a water quality study was undertaken, based on existing data and field samples. Seureca made technical recommendations to satisfy water treatment needs and encourage access to healthy water.
- Step 4 – Master Planning
Based on the gap between water demand and resources, an investment program was defined for each city, aligned with a reliable financial model.
Simultaneously, environmental measures were proposed to alleviate any negative impact due to the implementation of the proposed Master Plan.
- Step 5 – Consolidate a National Master Plan
The Master Plans were finally aggregated into a National Master Plan prioritizing the investments based both on return on investment, social criteria, and environnemental impact.
This Master Plan will serve as a tool for helping Camwater to manage and plan future investments.
A GIS (Geographical Information System) was also created, thus allowing the Client to update whenever necessary the Master Plan accordingly.
The implementation of this project in a short period of time was a real challenge from the beginning, as each City was visited, from North to South, East and West of the Country, with difficult accesses above all during the rainy seasons. We thank the team for having performed successfully and having submitted a final report which is of a great value.
Nicolas OTTOU ONANA – Project Manager, Camwater
Client benefits:
- Water resource and demand assessment
- Investment Planning
- GIS
Solution:
- Master Planning
250 000 customers:
7 200 000 inhabitants
5000 km of network
355 000 m3/day of water production